Main idea:
Masdar project ,how can they make a
clean energy and produce, near from Saudi Arabia border.
Summary:
-Abu Dhabi selected to sourcing 7
percent from renewable in nine years.
- The turbines help to achieve the project.
-Site of masdar helps it to produced
300 wm and the site has strongest wind.
-Masdar wants make contract as
January and wind farm would send the power to the electrical net before two
years.
-Wind power in UAE it is important
than solar power for improve GCC.
-the opinion wind plant will need a
same subside to move forward.
Paragraph:
Abu Dhabi selected 7 sourcing percent from renewable
in 9 years. The turbines help to finish the project. Moreover, site of Masdar
helps it to produce 300 WM and the site has a strongest wind because the wind achieves
the project. It wants create contract as January and wind farm would send the
power to the electrical net before tow years. The wind power in UAE it is
important than solar power for develop GCC. Finally, the wind plant will need a
same subside to move forward.
Word: 87
References
Malek, C. (2011, August 2). Desert
survival: finding water - The National. Latest and breaking news |
thenational.ae - The National. Retrieved February 25, 2013, from
http://www.thenational.ae/news/uae-news/environment/desert-survival-finding-water
Yee, A. (2011, April 27). Masdar plan
for $200m pioneering wind farm - The National. Latest and breaking news |
thenational.ae - The National. Retrieved March 4, 2013, from
http://www.thenational.ae/business/energy/masdar-plan-for-200m-pioneering-wind-farm
APA
formatting by BibMe.org
ليست هناك تعليقات:
إرسال تعليق